INTRODUCTION

Since its founding in 1948, our club has had to made do with temporary locations and vunerable to the site owner requiring the land back. It was just such an event that left us for most of the 90's without a permanent track. However, in 1999 we teamed up with Budmouth Technology College and now have a secure track location and Club house facilities.

The first track built at the college was an oval around the Main Technology Block with a passing loop and 5 steaming bays coming off a turntable. The track bed was made up of a number of different materials as it works it way round the building as lessons were learnt. The materials range from tarmac, to stone ballast and finally, a concrete base. Pictures of this first track can be found by clicking on to the link Archive of original track being built.

However in 2009 the college rebuilding programme required us to move the track to a new site within the grounds. These photos chart the progress of the redevelopment. A simple100 metre oval with both 5" and 7 1/4" tracks and steaming bays was initailly set up but once the all-weather football pitches were compeleted, the club was given the all clear to run the track between these and the college perimeter fence. Once at the end of the football pitches, the track was designed to loop round and return back parallel to the out track. This track was to be laid on stones.

On Saturday 30th September 2012 the Club Chairman announced that at exactly 16.00 hrs the track was completed and with great fanfare,the Budmouth electric loco did a lap of honour with John Clark at the controls.  It was actually more like ten laps of honour with each of the members present, getting a ride on the flat wagon behind. Work in now underway to iron out the humps and dumps.

Alas the celebration was short lived as some local householders had complained about the noise made by the 5-a-side footballer. As a result it was decided by 'those in the know' that an 8ft wooden fence would solve the problem. This decision meant that one lenght of the straight had to be move 2 feet across to allow clearance for the fence. This move was completed in March 2013. We now believe we have finally got a new club track.

We now have a permanent club track that we can be proud of brought about by the hard work of the club membership driven on by the tireless efforts of John Clark.

The pictures below show the stages of development of the main track but do not show the wind and rain! (click on images to see larger versions)

THE TRACK IS FINALLY FINISHED - MARCH 2013

RIDE THE TRACK by clicking 'here'

 

     

The steaming bays

  House keeping   trackside maintenance   The soundproof fence!
 
     
The return loop   the back straight   We can always watch football   entrance to the 'narrows'
       
The 'narrows'   Ralph's garden   The younger members gather for tea    

 

DEVELOPMENTS (Jun 2012)

     

the root of the problem

  At last - after 7 hours!!!   cutting the track bed   start of the bend
 
     
Apex of the bend   the back straight track trench   Committee design - again   Best dressed Irish navvy
  z        
Whilst proceeding in a northerly direction   Ralph's garden        

 

DEVELOPMENTS (Jun 2011)

      oct10

Building the bend

  Running alongside the new football pitch   The trail brazers   The Club garden
 
oct10   oct10   oct10   oct10
General view of the oval   The turntable in the making   Committee design - again   Loading ramp in the making
oct10            
THE START OF RELAYING THE TRACK - EARLY 2010
a   b   c   d

The final bend on the oval

  something like this   starting to relay the track   which end first
 
96   97   b   99
The front straight(ish)   The back straight   The new beginning   The shed base
 
98   100   a  
Untamed territory.   Club committee scales new heights   A little help from a friend   The last of the old track
DAYS GONE BY
small product photo   small product photo   small product photo   small product photo
inside the Clubhouse   view of station area   Passing loop and station area   I The steaming bays
 
small product photo   small product photo   small product photo    
The steaming bays   The steaming bays   south end